RURAL SERVICES

COAST TO COAST LAG

£51,208.80 FUNDED

The Truro Loops Project

Truro River Working Group CIC

To carry out a feasibility study into the viability and potential of the Truro Loops Project that will develop access infrastructure at the Truro River Basin (TR1).

Key documents

DESIGN BY DESIGN 79